Epoxy Preparation Quiz • Resin Academics

Epoxy Preparation Quiz

Preparation standards for Concrete, Wood, and Tile substrates (15 questions)

1) What is the best practice to create a bond profile on cured concrete before epoxy?

2) Which moisture check is appropriate for slab RH per ASTM F2170?

3) Maximum acceptable moisture vapor emission rate (MVER) for many epoxy systems without a mitigation primer is typically:

4) Before grinding an oily concrete area, the correct sequence is:

5) Hairline cracks in concrete are best addressed by:

6) After heavy cleaning or grinding, the surface pH should be:

7) On wood subfloors, acceptable moisture content before epoxy underlayment/primer is generally:

8) Preparing plywood for epoxy typically includes:

9) For movement-prone wood, the best primer choice is usually:

10) For ceramic tile, the correct prep before epoxy includes:

11) Tile grout lines should be:

12) Before coating old VCT/tiles that may have wax, you should:

13) A quick field check for existing sealers on concrete is to:

14) After grinding, the correct cleanup is:

15) Ideal ambient/surface conditions at installation (unless product spec says otherwise):

VIDEO COURSES

Countertop TutorialBundle Mode

HANDS-ON COURSES

CUSTOM FLOORING COURSE
Sep. 12th - Sep. 14th
El Paso, Texas
$1,650
GOD MODE
Sep. 12th - 14th
El Paso, Texas
$3,500